Skip Navigation Links.
Collapse <span class="m110 colortj mt20 fontw700">Volume 12 (2024)</span>Volume 12 (2024)
Collapse <span class="m110 colortj mt20 fontw700">Volume 11 (2023)</span>Volume 11 (2023)
Collapse <span class="m110 colortj mt20 fontw700">Volume 10 (2022)</span>Volume 10 (2022)
Collapse <span class="m110 colortj mt20 fontw700">Volume 9 (2021)</span>Volume 9 (2021)
Collapse <span class="m110 colortj mt20 fontw700">Volume 8 (2020)</span>Volume 8 (2020)
Collapse <span class="m110 colortj mt20 fontw700">Volume 7 (2019)</span>Volume 7 (2019)
Collapse <span class="m110 colortj mt20 fontw700">Volume 6 (2018)</span>Volume 6 (2018)
Collapse <span class="m110 colortj mt20 fontw700">Volume 5 (2017)</span>Volume 5 (2017)
Collapse <span class="m110 colortj mt20 fontw700">Volume 4 (2016)</span>Volume 4 (2016)
Collapse <span class="m110 colortj mt20 fontw700">Volume 3 (2015)</span>Volume 3 (2015)
Collapse <span class="m110 colortj mt20 fontw700">Volume 2 (2014)</span>Volume 2 (2014)
Collapse <span class="m110 colortj mt20 fontw700">Volume 1 (2013)</span>Volume 1 (2013)
Journal of Business and Management Sciences. 2019, 7(2), 64-71
DOI: 10.12691/JBMS-7-2-2
Original Research

Project Management Readiness: A Glimpse into the Troubled Rhetoric and the Expected Delivery of 2020 Priority Action Projects in Africa

EA Ochungo1, and Raila Amollo Odinga2

1Institute for Climate Change & Adaptation, University of Nairobi, Kenya

2African Union Special Envoy for Infrastructure, Kenya

Pub. Date: April 22, 2019

Cite this paper

EA Ochungo and Raila Amollo Odinga. Project Management Readiness: A Glimpse into the Troubled Rhetoric and the Expected Delivery of 2020 Priority Action Projects in Africa. Journal of Business and Management Sciences. 2019; 7(2):64-71. doi: 10.12691/JBMS-7-2-2

Abstract

Several studies have documented that Africa’s infrastructure construction firms often do not meet defined project objectives regarding; time, budget and functionality. This has often caused; delays, abandonment or disillusionments on the side of investors. Several contributing factors to these failures have been identified. However, very little if at all, seems to have been done on the project management readiness of African construction firms. Accordingly, this paper sought to assess Africa’s construction industry readiness to deliver the priority action projects. Using literature review method, the study established that Africa has a huge technical skills gap which is the main reason for the dismal performance in construction projects’ delivery. A readiness training model was developed for policy planners and educational practitioners to help build Africa’s human capacity in infrastructure project management. The paper strongly recommends for the adoption of the model. And with that, the Africa’s construction stakeholders may gradually improve their project management readiness.

Keywords

readiness, project management, skills, training, technical, human, contextual

Copyright

Creative CommonsThis work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/

References

[1]  Ofori, D. F. (2013). Project Management Practices and Critical Success Factors–A Developing Country Perspective. International Journal of Business and Management, 8(21).
 
[2]  Cooke, H. S. and Tate, K. (2005). The McGraw-Hill 36-Hour Course - Project Management New York, NY, McGraw-Hill.
 
[3]  Kenny C (2007). Construction, corruption and developing countries. World Bank Policy Research Working Paper 4271, June. Kerzner.
 
[4]  Smith, A. (1776). An inquiry into the nature and causes of the wealth of nations: Volume One. London: printed for W. Strahan; and T. Cadell, 1776.
 
[5]  Betts, M., Robinson, G., Blake, N., Burton, C., & Godden, D. (2011). Global construction 2020: A global forecast for the construction industry over the next decade. Global Construction Perspectives and Oxford Economics, London, England.
 
[6]  World Bank. 2008. Making Sense of Sub-Saharan Africa’s Infrastructure Endowment: A Benchmarking Approach.
 
[7]  Gannon, Colin and Zhi Liu (1997). Poverty and Transport. http://siteresources.worldbank.org/INTURBANTRANSPORT/Resources/twu-30.pdf.
 
[8]  Ayogu, M. (2007). Infrastructure and Economic Development in Africa: A Review. Journal of African Economies, 16(Supplement 1), 75-126.
 
[9]  Golubski, Christina (2017). Financing African infrastructure through pension funds. https://www.brookings.edu/blog/africa-in-focus/2017/03/14/financing-african-infrastructure-through-pension-funds/
 
[10]  Kodongo, O., & Ojah, K. (2016). Does infrastructure really explain economic growth in Sub-Saharan Africa? Review of Development Finance, 6(2), 105-125.
 
[11]  Pinto, J. K. & Slevin, D. P. (1988). Project success: definitions and measurement techniques. Project Management Journal, 19(1), 67-72.
 
[12]  Ofori-Kuragu, J. K., Baiden, B. K., & Badu, E. (2015). Performance measurement tools for Ghanaian contractors. International Journal of Construction Management, 16(1), 13-26.
 
[13]  Ika, L. A. (2012). Project Management for Development in Africa: Why Projects are Failing and What Can be Done about It. Project Management Journal, 43(4), 27-41.
 
[14]  Qobo, Mzukisi (2014). High Ambitions and High Risks: Programme for Infrastructure Development in Africa (PIDA). Heinrich Böll Stiftung Washington, DC, April 2014. https://za.boell.org/sites/default/files/hbs_qobo_high-ambitions-high-risks.pdf.
 
[15]  Ika, Lavagnon & Donnelly, Jennifer. (2017). Success conditions for international development capacity building projects. International Journal of Project Management. 35. 44-63.
 
[16]  Signé, Landry (2017). The road ahead for fixing Africa’s infrastructure deficit. https://www.brookings.edu/blog/africa-in-focus/2017/11/16/the-road-ahead-for-fixing-africas-infrastructure-deficit/.
 
[17]  Crowther, Geoff. (1985). Africa on a shoestring. South Yarra, Vic : Lonely Planet.
 
[18]  Zawdie,G. and Langford, D.A.(n.d). The State of Construction and Infrastructure in Sub-Saharan Africa and Strategies for a Sustainable Way Forward. http://www.irbnet.de/daten/iconda/CIB8978.pdf.
 
[19]  Zuofa, T., and Ochieng, E. (2016). Sustainability in Construction Project Delivery: A Study of Experienced Project Managers in Nigeria. Project Management Journal, 47(6), 44-55.
 
[20]  Muriithia,N and Crawford, L (2003). Approaches to project management in Africa: implications for international development projects. International Journal of Project Management 21 (2003) 309-319.
 
[21]  NgugT wa Thiong'o.(1993). Moving the Centre: The Struggle for Cultural Freedoms. London: James Currey; Nairobi: East African Educational Publishers; Portsmouth, NH: Heinemann, 1993.
 
[22]  Abubakar, Mu'awiya & Ibrahim, Yahaya. (2013). An Assessment of Readiness of the Nigerian Building Design Firms to Adopt Building Information Modelling Technologies. Conference: The Fifth International Conference for Construction Engineering and Project Management, ICCEPM 2013.
 
[23]  Akaba, Julius (2016). Formal project management adoption readiness of emerging construction firms in South Africa. http://ir.cut.ac.za/handle/11462/1341.
 
[24]  Aziz, N.M and Salleh,H.(2011). A readiness model for IT investment in the construction industry. African Journal of Business Management Vol.5 (7), pp. 2524-2530, 4 April 2011.
 
[25]  Kolo,B.A and Ibrahim,A.D (2010). Value management: how adoptable is it in the Nigerian construction industry? Conference Paper - West Africa Built Environment Research Conference. http://core.ac.uk/download/pdf/14616.pdf#page=675.
 
[26]  Kaba, B. (2019). Identifying an analytical tool to assess the readiness of aid information and communication technology projects. The Electronic Journal of Information Systems in Developing Countries, e12072.
 
[27]  Abramo, L. & Onitiri, R. (2007). Project managing readiness. Paper presented at PMI® Global Congress 2007—North America, Atlanta, GA. Newtown Square, PA: Project Management Institute.
 
[28]  Rondinelli, D. A. (1976). Why development projects fail: problems of project management in developing countries. Project Management Quarterly, 7(1), 10-15.
 
[29]  Konstantinou, E., & Müller, R. (2016). The Role of Philosophy in Project Management. Project Management Journal, 47(3), 3-11.
 
[30]  Muller, R. & Klein, G. (2018). What Constitutes a Contemporary Contribution to Project Management Journal? Project Management Journal, 49(5), 3-4.
 
[31]  Turner, J. R. (2006). Towards a theory of project management: The nature of the project governance and project management. International Journal of Project Management, 24(2), 93-95.
 
[32]  Kerzner, H.R. (2013) Project Management A Systems Approach to Planning, Scheduling, and Controlling. John Wiley, New York.
 
[33]  Lehtonen, M. (2014). Evaluating megaprojects: From the “iron triangle” to network mapping. Evaluation, 20(3), 278-295.
 
[34]  Project Management Institute (2013).A guide to the project management body of knowledge (PMBOK® guide). -- Fifth edition. Project Management Institute, Inc. 14 Campus Boulevard.
 
[35]  Mu¨ller,R and Turner,J.R.(2007). Matching the project manager’s leadership style to project type. International Journal of Project Management 25 (2007) 21-32.
 
[36]  Lundin, R. A., & Söderholm, A. (1995). A theory of the temporary organization. Scandinavian Journal of Management, 11(4), 437-455.
 
[37]  Flyvbjerg, B. (2011). Over budget, over time, over and over again. In Morris, P. W. G. , Pinto, J. K. , & Söderlund, J. (Eds.), Oxford handbook of project management (pp. 321–344). Oxford, UK: Oxford University Press.
 
[38]  Silvius, A.J.G. and Schipper, R.P.J. (2014). Sustainability in Project Management Competencies: Analyzing the Competence Gap of Project Managers. Journal of Human Resource and Sustainability Studies. 2(2):40-58.
 
[39]  VPiC (2018). African Union: improving regional infrastructure. https://www.giz.de/en/worldwide/28079.html.
 
[40]  Hardin,G.(1968). The Tragedy of the Commons. cience. 13 Dec 1968:Vol. 162, Issue 3859, pp. 1243-1248.
 
[41]  Santora, J. C., & Sarros, J. C. (2008). Founders, leaders, and organizational life cycles: the choice is easy – learn or fail! Development and Learning in Organizations: An International Journal, 22(3), 12-15.
 
[42]  Whetten, D. A. (1989). What Constitutes a Theoretical Contribution? Academy of Management Review, 14(4), 490-495.
 
[43]  Sallabaş, M.E.(2013). Analysis of narrative texts in secondary school textbooks in terms of values education.Academic Journals. Vol. 8(8), pp. 361-366, 23 April, 2013.
 
[44]  Haug, A., Graungaard Pedersen, S., & Stentoft Arlbjørn, J. (2011). IT readiness in small and medium‐sized enterprises. Industrial Management & Data Systems, 111(4), 490-508.
 
[45]  Hornstein, H. (2014). The integration of project management and organizational change management is now a necessity.
 
[46]  Rwelamila, P. D., Talukhaba, A. A., & Ngowi, A. B. (1999). Tracing the African Project Failure Syndrome: the significance of “ubuntu.” Engineering, Construction and Architectural Management, 6(4), 335-346.
 
[47]  Mbigi, L. and Maree, J. (1995), Ubuntu: The Spirit of African Transformation Management, Knowledge Resources (PTY) Ltd.
 
[48]  Swartz, E., & Davies, R. (1997). Ubuntu ‐ the spirit of African transformation management ‐ a review. Leadership & Organization Development Journal, 18(6), 290-294.
 
[49]  Wells, J. (1986) The Construction Industry in Developing Countries, London, Croom Holm.
 
[50]  Pruitt, D. G. (1997). Ripeness theory and the Oslo talks. International Negotiation, 2, 237-250.
 
[51]  Zartman, I. W. (2000). Ripeness: The hurting stalemate and beyond.In P.C. Stern & D. Druckman (Eds.), Conflict resolution after the Cold War (pp.225-250). Washington,DC: National Academy Press.
 
[52]  Zartman, I. W., and de Soto, A. (2010). Timing mediation initiatives. Washington, DC: United States Institute of Peace.
 
[53]  Akaba, Julius (2016). Formal project management adoption readiness of emerging construction firms in South Africa. http://ir.cut.ac.za/handle/11462/1341.
 
[54]  Kirchberger,Martina (2018). The role of the construction sector. WIDER Working Paper 2018/146. https://www.wider.unu.edu/sites/default/files/Publications/Working-paper/PDF/wp2018-146.pdf
 
[55]  Zhang, C., and J. Gutman (2015). ‘Aid Procurement and the Development of Local Industry: A Question for Africa’. Brookings Global Working Paper. Washington, DC: Brookings Institute.
 
[56]  Kharas H., Jeff G. and Christine Z. (2014). Pay More Attention to Construction Firms in Africa. http://blogs.worldbank.org/futuredevelopment/pay-more-attention-construction-firms-africa.
 
[57]  Asher, S., M. Kirchberger, and P. Novosad (2018). ‘The Cost of Infrastructure in Tanzania’. Unpublished manuscript.
 
[58]  Transparency International (2011). ‘Bribe Payer’s Index 2011’. Technical Report. Berlin: Transparency International.
 
[59]  Collier, P., M. Kirchberger, and M. Söderbom (2016). ‘The Cost of Road Infrastructure in Low and Middle Income Countries’. Policy Research Working Paper 7408. Washington, DC: World Bank. c World Bank. https://openknowledge.worldbank.org/handle/10986/22664 License: CC BY 3.0 IGO.
 
[60]  Benamghar, R., and A. Iimi (2011). ‘Efficiency in Public Procurement in Rural Road Projects of Nepal’. World Bank Policy Research Working Paper 5736. Washington, DC: World Bank.
 
[61]  El-hadj M. Bah et al., (2018). Housing Market Dynamics in Africa.
 
[62]  AbouRizk, S. (2010). Role of Simulation in Construction Engineering and Management. Journal of Construction Engineering and Management, 136(10), 1140-1153.
 
[63]  Adams, O. A. (1995). Indigenous contractors’ perceptions of the constraints on contractors’ performance and development programmes required in Nigeria. Habitat International, 19(4), 599-613.
 
[64]  Doraisamy, V. S., Akasha, Z. A., & Yunus, R. (2015). A Review on Abandoned Construction Projects: Causes & Effects. Applied Mechanics and Materials, 773-774, 979 983.
 
[65]  Zulch, B. G. (2016). A proposed model for construction project management communication in the South African construction industry. Acta Structilia, 23(1), 1-35.
 
[66]  Omoregie, A.and Radford, D. (n.d) Infrastructure delays and cost escalation: causes and effects in Nigeria. http://www.irbnet.de/daten/iconda/CIB_DC26986.pdf.
 
[67]  Snyman, T., and Smallwood, J. (2017). Improving Productivity in the Business of Construction. Procedia Engineering, 182, 651-657.
 
[68]  Cowie, George (2003),"The importance of people skills for project managers", Industrial and Commercial Training, Vol. 35 Iss 6 pp. 256-258.
 
[69]  Razaghi, Mohammad Ebrahim. (2015). Prioritizing managerial skills based on Katz’s theory.
 
[70]  Allais, Stephanie. (2012). Will skills save us? Rethinking the relationships between vocational education, skills development policies, and social policy in South Africa. International Journal of Educational Development. 32(5): 632–642.
 
[71]  Cardno, 2016. Final Report of the Independent Review of the Infrastructure Skills for Development (IS4D) Program. https://dfat.gov.au/about-us/publications/Documents/infrastructure-skills-for-development-independent-review.pdf.
 
[72]  Flyvbjerg, B. (2014). "What You Should Know about Megaprojects and Why: An Overview," Project Management Journal, vol. 45, no. 2, April-May, pp. 6-19.
 
[73]  Gauthier, J.-B., & Ika, L. A. (2012). Foundations of Project Management Research: An Explicit and Six-Facet Ontological Framework. Project Management Journal, 43(5), 5-23.
 
[74]  Abbott, A. (1988). The system of professions: An essay on the division of expert labor. London, England: The University of Chicago Press.
 
[75]  Drouin, Nathalie & Sankaran, Shankar & Müller, Ralf. (2016). The Nature of Organizational Project Management and its Role as an Organizational Capability. 16th EURAM, Paris, 1-4 June.
 
[76]  Joslin, R., & Müller, R. (2016). The relationship between project governance and project success. International Journal of Project Management, 34(4), 613-626.
 
[77]  Ofori, G (2015). Nature of the Construction Industry, Its Needs and Its Development: A Review of Four Decades of Research. Journal of Construction in Developing Countries, 20(2), 115-135, 2015.
 
[78]  Kangan, M. (1974). TAFE in Australia: Report on needs in technical and further education. Canberra: Australian Government Publishing Service.
 
[79]  Maclean, R., Jagannathan, S., & Sarvi, J. (Eds.). (2013). Skills Development for Inclusive and Sustainable Growth in Developing Asia-Pacific. Technical and Vocational Education and Training: Issues, Concerns and Prospects.
 
[80]  Richard K. Johanson; Arvil V. Adams. 2004. Skills development in Sub-Saharan Africa (English). World Bank regional and sectoral studies. Washington, DC: World Bank. http://documents.worldbank.org/curated/en/764171468741592643/Skills-development-in-Sub-Saharan-Africa.
 
[81]  Voordijk, H., de Haan, J., & Joosten, G.-J. (2000). Changing governance of supply chains in the building industry: a multiple case study. European Journal of Purchasing & Supply Management, 6(3-4), 217-225.
 
[82]  Arnaboldi, M., Azzone, G., & Savoldelli, A. (2004). Managing a public sector project: the case of the Italian Treasury Ministry. International Journal of Project Management, 22(3), 213-223.
 
[83]  Kingombe, C. (2014). Hard and Soft Infrastructure Development in Africa. In multi-year WTO expert meeting on transport, trade logistics and trade facilitation (pp. 1-39).
 
[84]  Biggs, T., Shah, M., Srivastava, P., & Mundial, B. (1995). Technological capabilities and learning in African enterprises. Washington: World.
 
[85]  Gibb, A.A., 1997. Small Firms Training and Competitiveness. Building Upon the Small Business as a Learning Organisation. International Small Business Journal, (1997), 13-29.
 
[86]  Boye, T., Fenichel, A., & Mennasemay, M. (1988). Skill Transfer and African Development: a Conceptual Research Note. The Journal of Modern African Studies, 26(04), 685.
 
[87]  Paul Bennell,(1986) 'Engineering Skills and Development: the manufacturing sector in Kenya', in Development and Change (London), 17, 1 986, pp. 303-24.
 
[88]  Blomstrom, M., & Sjoholm, F. (1998). Technology Transfer and Spillovers? Does Local Participation with Multinationals Matter?
 
[89]  Mohamedbhai, Goolam (2015). Improving the Quality of Engineering Education in Sub-Saharan Africa. International Journal of African Higher Education. Number 80: Spring 2015 pp 25-27.
 
[90]  Juma, C. (2016). Innovation and Its Enemies: Why People Resist New Technologies. Oxford University Press, New York, 2016, 432 pages.
 
[91]  Mc Cowan, T. et al (2016). Universities, employability and inclusive development: repositioning higher education in Ghana, Kenya, Nigeria and South Africa. https://ereadiness.kenet.or.ke/sites/default/files/ctools/Graduate%20employability%20final%20report.pdf.
 
[92]  Duermeijer, Charon et al 2018. Africa generates less than 1% of the world’s research; data analytics can change that. https://www.elsevier.com/connect/africa-generates-less-than-1-of-the-worlds-research-data-analytics-can-change-that.
 
[93]  Ratcheva, Vesselina, SaadiaZahidi, and Richard Samans. “The future of jobs and skills in Africa: preparing the region for the Fourth Industrial Revolution.” Executive briefing (World Economic Forum) May 2017. Geneva: World Economic Forum, 2017. Online. Internet. 01 Mar 2019. Available: https://www.weforum.org/reports/the-future-of-jobs-and-skills-in-africa-preparing-the-region-for-the-fourth-industrial-revolution.
 
[94]  Skitmore Martin, Smyth Hedley (2006). Pricing construction work: a marketing viewpoint. http://discovery.ucl.ac.uk/4640/1/4640.pdf.
 
[95]  Fang et al (2012). Network theory-based analysis of risk interactions in large engineering projects. Reliability Engineering and System Safety 106 (2012) 1-10.
 
[96]  Kissi et al.,(2017). Assessment of critical barriers to tender price indices development in the Ghanaian building industry. Journal of Construction Project Management and Innovation. Volume 7 Number Supplement 1, Aug 2017, p. 1933-1953.
 
[97]  Alam, M. ,A. Gale, M. Brown, A.I. Khan, (2010),"The importance of human skills in project management professional development", International Journal of Managing Projects in Business, Vol. 3 Iss 3 pp. 495-516.
 
[98]  Hellström, T. (2017). Centres of Excellence and Capacity Building: from Strategy to Impact. Science and Public Policy, 45(4), 543-552.
 
[99]  Azim Syed, Andy Gale, Therese Lawlor-Wright, Richard Kirkham, Ali Khan, Mehmood Alam, (2010),"The importance of soft skills in complex projects", International Journal of Managing Projects in Business, Vol. 3 Iss 3 pp. 387-401.
 
[100]  Jones,N et al.2007. Research capacity strengthening in Africa Trends, gaps and opportunities. Overseas Development Institute. https://www.odi.org/sites/odi.org.uk/files/odi-assets/publications-opinion-files/2774.pdf.
 
[101]  Crosbie, Rowena (2005),"Learning the soft skills of leadership", Industrial and Commercial Training, Vol. 37 Iss 1 pp. 45-51.
 
[102]  Baron Louis and Morin Lucie, (2010),"The impact of executive coaching on self#efficacy related to management soft#skills", Leadership & Organization Development Journal, Vol. 31 Iss 1 pp. 18-38.
 
[103]  Lapsinger, R. and Lucia, A.D. (1997). The art and science of 360 Degree feedback, Pfeiffer, San Francisco, A.
 
[104]  Achebe, C. (1984). The Trouble With Nigeria. Oxford: Heinemann Educational Publishers.
 
[105]  Philips, J. E. (2005). The Trouble with Nigeria . African Studies Review, 48(02), 133-139.
 
[106]  Larson, G. S., Carey, C., Grarup, J., Hudson, F., Sachi, K., … Vjecha, M. J. (2016). Lessons learned: Infrastructure development and financial management for large, publicly funded, international trials. Clinical Trials, 13(2), 127-136.